1. Legal entity and export rights
Start with the legal identity, not the catalogue. Ask for the business licence, the customs registration number and the name of the bank account that will receive the deposit. The company name on the licence, the name on the proforma invoice and the name on the bank account should be the same legal entity.
Third-party payments to an individual account are the single most common warning sign in small-tonnage steel trade. They remove almost every route to recovery if the goods are wrong or never ship.
2. Certification, checked at the source
An ISO 9001 certificate on a supplier's website proves that a PDF exists. Check the certificate number and the certified scope in a public certification database — for IAF-accredited certificates, IAF CertSearch is the usual starting point — and confirm that the scope covers manufacturing or trading of the products you are buying.
Certification is evidence that a quality management system exists. It is not evidence that a particular heat of steel meets a particular standard. That is what the mill certificate is for.
3. The mill test certificate
For steel, the inspection document is normally an EN 10204 3.1 mill test certificate. Type 3.1 means the certificate is issued by the manufacturer's independent inspection department and reports the actual test results for the material supplied — chemistry, mechanical properties and, where applicable, heat treatment condition.
Compare the certificate to the purchase order line by line: grade designation, standard, dimensions, quantity, heat number, chemical composition against the standard limits, and mechanical properties against the minimum values. A certificate that reports results without a heat number, or reports the standard's limits instead of measured values, is not a 3.1 certificate.
4. Heat number traceability
The heat number on the certificate must match the number stencilled, stamped or tagged on the goods, and it must match the packing list. Ask for photographs of the marking before dispatch. On plate and coil, the heat number is normally stencilled on the surface or on a tag fixed to the bundle.
Where the heat number cannot be reconciled, the certificate describes some other steel. That is the point at which a shipment stops being a commercial problem and becomes a metallurgical one.
5. Positive material identification
PMI uses a handheld X-ray fluorescence or optical emission analyser to confirm the alloy in front of you. It takes minutes per piece and it detects the most expensive substitution in the trade: 304 supplied against a 316 order, or a 200-series grade supplied against a 304 order.
PMI cannot measure carbon reliably with XRF, so it does not distinguish 304 from 304L. It does identify chromium, nickel and molybdenum content, which is what most grade substitutions turn on.
6. Third-party inspection
For a first order, or any order above the value you are willing to write off, appoint an independent inspection company for a pre-shipment inspection. The standard scope covers quantity, dimensions, surface condition, marking, packing and documentary review, with PMI added as an option.
Inspection is most effective when it is agreed before the order, with the acceptance criteria written into the contract. An inspector who arrives without agreed criteria can only describe what he sees.
7. Where the metal actually came from
Ask which mill rolled the material. A trading company that cannot name its mill sources is buying from whoever has stock that week, which makes consistency between orders unlikely. Repeat orders of the same part should come from the same mill and, where possible, comparable heats.
This matters most for forming and welding: two nominally identical 304 coils from different mills can behave differently on the same press line because of small differences in chemistry and processing.
8. Packaging and marking
Specify the packing in the contract: wooden pallet or case, interleaved sheets, edge protection, strapping pattern, moisture barrier, and marking that carries the grade, size, heat number and order reference. Sea freight involves six weeks of humidity, and inadequate packing produces claims that were entirely avoidable.
For coil, agree whether it ships eye-to-sky or eye-to-wall, and confirm the inner diameter and maximum coil weight your line can handle.
9. Commercial safeguards
Payment structure should match the risk. Common terms in this trade are 30% T/T in advance with the balance against a copy of the bill of lading, or a letter of credit at sight. Both give the buyer a documentary checkpoint before the balance is released.
Whatever the terms, keep the specification, the tolerance, the packing, the inspection scope and the documentation list inside the contract rather than the email thread. A specification that exists only in correspondence is difficult to enforce.
Red flags worth walking away from
- A price far below the mill price for the same grade, with no explanation of the source.
- Certificates that cannot be matched to a heat number on the goods.
- Reluctance to allow pre-shipment inspection or PMI.
- Payment requested to an account in a different name from the contracting entity.
- Grade substitutions proposed after the order is placed, without a written variation.
- Photographs of "your" goods that turn out to be stock images.
None of these individually proves bad faith. A supplier who resists all of them at once is telling you something.